Serving Petaluma, Santa Rosa & the Bay Area
Asphalt and Concrete (707) 217-0835
Our Services

Parking Lot Striping in Petaluma, CA

Parking Lot Striping · Petaluma, CA

Fresh lines and a layout that meets code

Parking lot striping is what makes a lot in Petaluma work. The lines tell drivers where to park, where to drive and where they cannot stop. They carry the accessible spaces, the fire lanes and the arrows that a fire marshal or building official checks. Line striping is the same job under a different name. Paint fades under sun and tires, and a faded lot loses stalls and loses compliance. We stripe new lots and restripe old ones across Sonoma County.

Most striping work follows something else. A commercial lot gets paved, or a fresh seal coat goes over the old surface. Either way the layout has to come back. Other lots just need the lines put back after years of traffic. We stripe after potholes and failed spots are cut out too, since a patch takes the old paint with it. Restriping is the least expensive work you can do on a lot. It is also the first thing a customer notices.

What We Handle

  • Parking lot striping and restriping
  • ADA stalls with access aisles and van spaces
  • Parking lot layout and re-layout
  • Painted accessibility symbol and NO PARKING lettering
  • Fire lane markings and red curbs
  • Directional arrows and painted stop bars
  • Crosswalks and no parking zones marked
  • Striping after paving or resurfacing

Get a Parking Lot Striping Estimate

Tell us about your project and we will get right back to you.

What are the ADA parking rules in California?

California uses its own accessibility code, Chapter 11B of the California Building Code. It sets how many accessible stalls a lot needs. A lot with 1 to 25 spaces needs one. From 26 to 50 spaces it needs two. From 51 to 75 it needs three, and 76 to 100 needs four. At least one of every six accessible spaces has to be a van space. A car stall is 108 inches wide and 216 inches long at a minimum. A van stall is 144 inches wide.

The access aisle beside each accessible stall is 60 inches wide. It runs the full length of the stall. The aisle gets a blue painted border with hatched lines no more than 36 inches apart. NO PARKING goes inside it in white letters at least 12 inches tall. The accessibility symbol is painted white on a blue background, at least 36 inches square. A tow away sign of 17 by 22 inches goes up too. Vehicle Code section 22511.8 carries the same sign rule. Civil Code section 52 puts the floor for damages at $4,000 per offense.

Do I need a restripe or a new layout?

If the parking lot layout still works and the lines have just faded, a restripe is the job. We paint over the existing lines, so the stalls, arrows and aisles land where they always did. Most lots reach that point every 18 to 24 months. Drive aisles, delivery routes and full sun wear paint faster than the stalls do. Once the accessibility symbol or the aisle lettering is hard to read, the lot is past due.

A new layout is a different job. The US Access Board treats resurfacing or an overlay as an alteration rather than maintenance. The restriped lot then has to meet the current accessible parking rules, even if the old layout did not. Repainting a few existing stalls in place stays maintenance. Adding or removing spaces also puts the count back in play. If you are weighing resurfacing a lot against replacing it, settle the surface first and stripe after.

What we mark and how a striping job runs

We stripe the lots we pave and resurface, and we restripe lots that have gone faded. The layout covers standard stalls plus ADA stalls with access aisles and van spaces. The painted accessibility symbol and the NO PARKING aisle lettering go with them. We paint directional arrows, stop bars, crosswalks, fire lanes, red curbs and no parking zones. Stencils for visitor, reserved and compact stalls go down at the same time. We also mark where the required signs belong.

Ramps, walkways and curb work are concrete jobs. The company pours those as flatwork, walkways and curbs. Sign posts, wheel stops and speed bumps sit outside our striping work, along with thermoplastic markings and interior warehouse floors. The painting itself needs clean, dry pavement. We chalk the layout first, then run waterborne traffic paint. New work gets two coats once the asphalt has cured. The Bay Area Air Quality Management District caps traffic marking coatings at 100 grams of VOC per liter. Lots that cannot close get night or weekend work.

Striping in Petaluma and Sonoma County

Fire lane marking follows the fire code and gets approved by the local fire official. Permit Sonoma's fire lane bulletin points to California Fire Code Section 503. It allows a red curb or red pavement edge with FIRE LANE painted in a contrasting color. Santa Rosa spells it out further. Curbs go OSHA safety red there. The fire lane and no parking wording is 3 inch white letters, spaced 30 feet on center. We paint to what the reviewing office asks for.

The lots we stripe here are tasting room and winery visitor lots, apartment complexes and business parks. Medical and retail lots and HOA property fill out the rest. Paint needs dry pavement, and the county gives a long dry window. Petaluma Airport records average 0.06 inches of rain in July and 0.09 in August. That is against about 24 inches for the year. We stripe lots in Santa Rosa, Rohnert Park, Windsor, Novato and San Rafael. We travel for East Bay lots in Oakland. You can ask for a striping estimate before the rains return.

Freshly painted blue accessible parking symbol with white PARKING lettering on new asphalt in tree shade Repaved parking lot with a white directional arrow painted on the asphalt and cars parked along the far side

Ready to get started?

Clear written estimates across Petaluma, Santa Rosa & the Bay Area.

(707) 217-0835
What You Can Expect

How a Job With Rich's Paving Runs

From the first site visit to the final pass of the roller, here is how it goes.

1

Look at the Job

We come see the site: the old surface, the ground under it, how water moves, and what the job really takes. No blind quotes over the phone.

2

Clear Estimate

You get a written estimate with a real number and a real timeline. It covers what is included, from grading and base rock to the finished surface, and it holds unless the scope changes.

3

Do the Work

Our own crew and equipment show up when we said and build the job the way we quoted it. Base first, then the surface, compacted and finished right.

4

Walk It With You

Before we call a job done, we walk it with you. Clean edges, solid compaction, water running where it should. Done means you say it is done.

FAQ

Parking Lot Striping Questions, Answered

Common questions about parking lot striping across Petaluma, Santa Rosa & the Bay Area. Don't see yours? Give us a call.

Call (707) 217-0835

How much does parking lot striping cost?
HomeAdvisor publishes $5 to $20 for a single 18 foot stall line. Standard lines run $0.20 to $1.00 per linear foot, and accessible stalls $25 to $40 each. HomeAdvisor puts most striping projects between $500 and $1,000. Those are published national ranges, and California labor sits above them.
How often should a parking lot be restriped?
Most parking lots need a restripe every 18 to 24 months. Traffic volume, delivery trucks and full sun set the pace, and some quiet lots stretch closer to three years. Watch the accessibility symbol and the aisle lettering. Those fade first, and they are the markings that get checked.
Can I stripe my own parking lot?
Yes, for a small private lot with a few straight stalls and no accessible spaces. Layout and code are where it goes wrong. California Building Code Chapter 11B sets stall widths, 60 inch access aisles, van spaces and the painted symbol. A wrong layout carries a $4,000 minimum in damages under Civil Code section 52.
How many handicap parking spaces do I need in California?
California Building Code Table 11B-208.2 requires one accessible space in a lot of 1 to 25 spaces. Lots of 26 to 50 need two, 51 to 75 need three, and 76 to 100 need four. At least one of every six accessible spaces has to be a van space.
How long before cars can park on fresh striping?
About 45 minutes to an hour in warm, dry weather before the lines will take traffic. Full cure runs 24 to 48 hours. Cold or damp air stretches both numbers. We stage the work so a finished section can reopen while the next one is painted.
Can you stripe new asphalt right after paving?
No, new asphalt needs about 30 days to cure before paint goes down. Applied early, waterborne paint lifts and peels off the fresh surface. A new seal coat needs at least 24 hours, and 36 to 48 hours in cool or damp weather. We set the striping date when the paving is scheduled.
More From Rich’s Paving

Explore Our Other Services

Commercial & Parking Lots in Petaluma, CA

Commercial & Parking Lots

Commercial paving for parking lots at offices, apartment complexes, retail centers, business parks and wineries, including striping and ADA layout.

Sealcoating in Petaluma, CA

Sealcoating

We sealcoat asphalt driveways and parking lots across Sonoma County. A fresh seal coat restores the black finish and slows sun and water damage.

Resurfacing & Overlays in Petaluma, CA

Resurfacing & Overlays

We resurface asphalt driveways and parking lots across Petaluma and Sonoma County, milling the old surface and laying a fresh hot mix overlay.

Why Choose Rich's Paving

Why North Bay Property Owners Call Us

Three Generations of Paving

Rich's Paving is a third generation family paving company. The family name is on the work, and the family runs the crew on every job.

Asphalt and Concrete

Most companies do one or the other. We install both, so you get a recommendation based on your property, not on the only material a contractor happens to sell.

Our Own Equipment and Crew

Paver, rollers, dump trucks and compaction equipment, run by our own crew. The schedule and the quality stay in our hands from grading to the last pass.

Built for Sonoma County Ground

Clay soils that swell in the winter rain and shrink all summer. We have paved on this ground since 1988, and we build the base for what it does.

Guides & Resources

Parking Lot Striping Guides

Ready to Start Your Project?

Get In Touch With Rich's Paving

A driveway past its best years, a parking lot due for new stripes, or a gravel road that needs real grading? Call or send the form. We will come look at the job and put a clear estimate in your hands, from the family that has paved Sonoma County since 1988.

Get an Estimate

Tell us about your project and we will get right back to you.